Train load hits RB Saltwater Park pedestrian bridge
Thursday, December 10, 2020
The City of Shoreline has announced that the pedestrian bridge at RB Saltwater Park is temporarily closed due to an impact from a load carried by a train.
The load was a crane.
The bridge will remain closed until inspected by a structural engineer to ensure that it is safe. Because of the closure, there is no beach access at the park.
The bridge will remain closed until inspected by a structural engineer to ensure that it is safe. Because of the closure, there is no beach access at the park.
Updated 12-13-20
1 comments:
There's a report of this from someone who saw it happen on see-click-fix. It looks pretty scary and could have been much worse.
Post a Comment