With the recent derailment of an Amtrak Cascades train, we wanted to talk a bit about the Point Defiance Bypass and our agency’s work to develop it for Amtrak Cascades passenger train service. Our thoughts remain with the passengers and families involved in the tragic Monday, Dec. 18, derailment and we want to answer questions that have arisen about the tracks where the train derailed.
Long-range planning to develop these tracks for expanded passenger rail service began more than a decade ago and was initially conceptual – looking at all possible options. The long-range plan referenced in recent media stories states it was developed “without financial constraints” and goes on to explain “as a result, the plan’s ‘building blocks’ with the operational benefits are intended to be implemented incrementally.”
As a transportation agency, we must always balance providing service goals with funding and schedule constraints. Our goal with our recent improvement project was to provide better reliability and six Seattle to Portland roundtrips. The work done on the Point Defiance Bypass – and the rest of the tracks from Blaine to Vancouver, Washington – achieved those goals, allowing us to continue to travel at the same maximum speed as before – 79 mph – but improving the reliability of our service and giving travelers two additional options for daily roundtrip service.
The track configuration as it exists today meets all Federal Railroad Administration requirements.
The bypass tracks have a reduced speed limit before the curve where the derailment took place to inform engineers to decrease their speed to negotiate the curve. The maximum speed limit decreases from 79 mph to 30, with signs posted two miles before the speed zone and just before the speed zone approaching the curve. Amtrak is responsible for ensuring all engineers on this specific set of tracks are qualified. It is common for railroads to have areas of reduced speeds due to curves or other factors, as found along the entire Cascades route.
Trains successfully ran the bypass track numerous times in the past few months during track testing, locomotive testing and engineer qualification on the tracks, and the ceremonial train ride with passengers on Dec. 15 during the new station dedication.
The investigation by the National Transportation Safety Board (NTSB) will determine the cause of the derailment and we cannot speculate as to what caused it while the NTSB conducts its important work. We’ll continue to share updates and any information we can while the NTSB investigation continues.
No comments:
Post a Comment
We encourage the thoughtful sharing of information and ideas. We expect comments to be civil and respectful, with no personal attacks or offensive language. We reserve the right to delete any comment.