Detour from 8th NW Sept 5-7 - take it slow and follow the signs
Tuesday, August 29, 2017
8th Ave NW detour south of Richmond Beach Rd
Tuesday, September 5 - Thursday, September 7
between 8:00am and 5:00pm
Approximately 200 feet of 8th Ave NW in both directions will be closed south of Richmond Beach Rd NW, including the right turn from Innis Arden Drive NW onto 8th Ave NW, between 8:00am and 5:00pm Tuesday, September 5 through Thursday, September 7.
This work is being done to replace a severely failed section of concrete stormwater pipe crossing 8th Ave NW south of Richmond Beach Road. Overall poor conditions of this pipe warrant complete structure-to-structure replacement.
Detour routes will be signed along 3rd Ave NW and NW 185th St. 8th Ave NW will be re-opened in both directions on Tuesday September 5 and Wednesday September 6 from 5:00pm to 8:00am the following morning using steel plates to cover work areas.
Any questions or comments should be directed to project manager John Featherstone 206-801-2478.
0 comments:
Post a Comment