Aurora Corridor update 192nd to 205th construction
Questions or concerns about construction? Call 206-801-2485 or email
Roadway Work
Over the next several weeks, storm drainage will be installed on the east side of Aurora from N 198th to N 200th Streets. Excavation and grading will occur on the east side of Aurora. Drilling for the structural sidewalk will commence north of N 200th Street (Costco side of Aurora). Trucks will be entering and leaving the roadway in the work zones. Drivers should obey the speed limit and drive carefully through the area. Pedestrians should avoid walking through the work zones.
Utility Work
The joint utility trench excavation and installation will continue on the east side of Aurora. Starting the week of April 27, joint utility work is scheduled to begin on Echo Lake Place and N 195th Street, and is anticipated to last for the whole week. Please expect more crews and equipment on these side streets during this time.
Traffic Revisions on Aurora and N 200th Street
Traffic has been shifted to the west on Aurora. Left turns will not be allowed from Aurora to N 200th Street until further notice. Left turns are also not allowed onto any of the non-signalized streets (N 195th to N 199th).
Traffic on N 200th Street east of Aurora to the first driveway into Aurora Village / Costco is reduced to one lane of traffic westbound for approximately 4 months in order for crews to construct a structural sidewalk. Transit routes leaving the Aurora Transit Center have changed. Please visit King County Metro and Community Transit for the latest details. King County Metro customer service can be reached at 206-553-3000 and Community Transit can be reached at 425-353-RIDE (7433).