Pages

Sunday, April 7, 2013

Shorecrest modernization - update and photos

Looking east at south wall of west wing
Commons area at far end

Construction of the new Shorecrest High School is well underway and scheduled for completion in 2014. This update and photos courtesy Shoreline Schools.

Looking northeast at west end of west wing
Stair Tower #1 at corner
Main Building
  • Construction is well under way on the three-story main academic building, scheduled for completion in early 2014.
  • Structural steel framing and concrete shear wall installation continues, proceeding west to east.
  • Concrete floor slabs are being poured.
  • Installation of underground utilities (power, water, and sewer) continues.
  • Installation of metal stud wall framing at second and third floor levels to continue.
  • Electrical rough-in and installation of mechanical ductwork continues.
  • Erection of structural steel columns and beams for all floor levels in the east wing will begin soon.
  • Installation of storm and sanitary sewer lines around Main building continues.

Looking east/northeast at roof and floor framing
Stair towers #3 and #4 to the left

Gymnasium

The new gymnasium is now open and being used for physical education classes and by athletic teams. It includes the main gymnasium, auxiliary gym, classroom, locker rooms, weight room and aerobics/exercise room. Some finish work continues in the building.

Looking southeasr

Performing Arts Building

The Performing Arts building is now fully open, including the renovated theater and classrooms for band, choir, orchestra, drama and visual arts.

Looking north from third floor (at east end of west wing):
Stair Tower 33 at left; Elevator and shear walls at center;
Stair Tower #4 at right.

Tennis Courts at Kellogg

Come watch a girls tennis match this spring on the new courts, which are now open for public use during non-school hours or when the Shorecrest team isn't using them for practice or matches.

Looking north from third floor:
Walls of elevator and shear wall at left;
Stair Tower #4 at right.

Looking west from third floor at exterior north wall
of the west wing.


No comments:

Post a Comment

We encourage the thoughtful sharing of information and ideas. We expect comments to be civil and respectful, with no personal attacks or offensive language. We reserve the right to delete any comment.