Aurora construction update for the week of November 6, 2011

Monday, November 7, 2011

N 165th - N 185th Streets (Marshbank Construction)

This week, crews will:
  • Continue removing temporary signal poles and equipment between N 170th and N 180th Streets.
  • Continue restoration activities along Aurora including landscaping and installation of remaining concrete features. Intermittent lane closures may be required. Restoration work will continue throughout the fall.


N 185th - N 192nd Streets (Johansen Excavating)

This week, crews will:
  • Continue installing concrete driveways on the east side of Aurora and N 192nd Street. Concrete pouring will temporarily close or change access to driveways; drivers should look for delineated driveways and blue Business Access signs.
  • Install a permanent railing on the west side of Aurora adjacent to the Shoreline Park & Ride. A single lane in the southbound direction will be closed. Sidewalk closures and pedestrian detours will also be required.
  • Temporarily close access to N 192nd Street east of Aurora (following the completion of concrete driveway work) to prepare the work zone for paving.
  • Continue conducting electrical work in preparation for installation of permanent street lighting.
  • Continue pouring the concrete face of the new retaining wall in front of Sky Nursery.
  • Continue pouring and staining concrete features at the Rain Garden Plaza in the northeast corner of the Shoreline Park and Ride.

There will be no construction on Friday, November 11 in observation of Veterans Day.


0 comments:

Post a Comment

We encourage the thoughtful sharing of information and ideas. We expect comments to be civil and respectful, with no personal attacks or offensive language. We reserve the right to delete any comment.

ShorelineAreaNews.com
Facebook: Shoreline Area News
Twitter: @ShorelineArea
Daily Email edition (don't forget to respond to the Follow.it email)

  © Blogger template The Professional Template II by Ourblogtemplates.com 2009

Back to TOP