Aurora Corridor, N 165th to N 192nd - construction week of September 6

N 165th - N 185th Streets (Marshbank Construction)

This week, crews will:
  • Adjust iron features (such as stormwater grates) at night on Aurora, N 175th Street, and N 185th Street. Single lane closures on these streets are expected.
  • Build the crosswalk at N 170th Street west of Aurora on Wednesday. Access to N 170th Street will be fully closed during the day and reopened in the evening.
  • Build the crosswalk at N 167th Street east of Aurora on Friday. Access to N 167th Street will be fully closed during the day and reopened in the evening.
  • Continue wiring new signals and street lights and continue installing landscaping along Aurora, N 175th Street, and N 185th Street. Single lanes on these streets may be intermittently closed.
  • Pour the southeast sidewalk corner of N 185th Street and Midvale Avenue (pending completion of Frontier work).
  • Continue converting electrical, phone, and communications services to new underground systems and removing old overhead lines.

N 185th - N 192nd Streets (Johansen Excavating)

This week, crews will:
  • Continue pouring sidewalks on the west side of Aurora.
  • Continue installing new stormwater systems on N 192nd Street east of Aurora within the temporary work zone.
  • Begin installing irrigation pipes and topsoil in planter boxes along the west side of Aurora.
  • Continue planning for major excavating, grading, and paving work at the N 192nd Street intersection scheduled for the week of September 11. Following intersection work, crews will shift construction to the east side of Aurora.
  • Begin prepping for concrete pouring at the Shoreline Park and Ride Rain Garden Plaza.


No comments:

Post a Comment

We encourage the thoughtful sharing of information and ideas. We expect comments to be civil and respectful, with no personal attacks or offensive language. We reserve the right to delete any comment.