Aurora Corridor, N 165th to N 192nd - construction week of September 6
Tuesday, September 6, 2011
N 165th - N 185th Streets (Marshbank Construction)
This week, crews will:
- Adjust iron features (such as stormwater grates) at night on Aurora, N 175th Street, and N 185th Street. Single lane closures on these streets are expected.
- Build the crosswalk at N 170th Street west of Aurora on Wednesday. Access to N 170th Street will be fully closed during the day and reopened in the evening.
- Build the crosswalk at N 167th Street east of Aurora on Friday. Access to N 167th Street will be fully closed during the day and reopened in the evening.
- Continue wiring new signals and street lights and continue installing landscaping along Aurora, N 175th Street, and N 185th Street. Single lanes on these streets may be intermittently closed.
- Pour the southeast sidewalk corner of N 185th Street and Midvale Avenue (pending completion of Frontier work).
- Continue converting electrical, phone, and communications services to new underground systems and removing old overhead lines.
N 185th - N 192nd Streets (Johansen Excavating)
This week, crews will:
- Continue pouring sidewalks on the west side of Aurora.
- Continue installing new stormwater systems on N 192nd Street east of Aurora within the temporary work zone.
- Begin installing irrigation pipes and topsoil in planter boxes along the west side of Aurora.
- Continue planning for major excavating, grading, and paving work at the N 192nd Street intersection scheduled for the week of September 11. Following intersection work, crews will shift construction to the east side of Aurora.
- Begin prepping for concrete pouring at the Shoreline Park and Ride Rain Garden Plaza.